After making several laps around the arena the train stopped and a production number followed involving the unloading of the train and the assemblage of the ring curb and arena.
I might add that this elephant continued with these wagons right on out the back door stage left to an area where she and two others were quickly blanketed and returned pulling them in the opening spec.
|
Thursday, June 05, 2014
1976 Circus World #3
Posted by Buckles at 6/05/2014 06:55:00 AM
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment